PHASE 1
Our goal is to raise $219,559.00 to refurbish William Charles Lunalilo Playground, also known locally as Blue Park.
We plan to purchase equipment from an authorized vendor and work with the county on placement for the equipment.
Phase #1 will consist of resurfacing the grounds of the park.
Lawn Area (Phase 1)
A. Soft-Lawn Lead-Free Z3 Zoysia with Anti-Static Yarn Lawn Surface
B. The Turf is to be laid out to minimize quantities of seams and seamed together per manufacturer’s specifications
C. The turf shall be stretched to assure there are no wrinkles in surface
D. The perimeter of the turf shall be continuously tucked in and adhered to hardscape
E. Wonderfill Infill with Anti-microbial Coating
F. The In-fill shall be mechanically brushed into the blades to assure a consistent and even surface
G. ~6400 sf
Proposed Price $116,855.00
4.167% Tax: 4,869.35
Bonding 3,651.73
Total Contract: $125,376.08
Phase #2 will consist of adding the following equipment:
A. Layout and confirm Fall Zone requirements
B. Assembly and Installation per Miracle specifications
C. Components
1. CONCERTO VIBES
2. CONCERTO TALL CHIMES
3. KC INTERACTIVE PANEL FRAME
4. MM DYNAMICS LAB
5. MINI CITY PLAY HOUSE
6. PIROUETTE
7. TEETER SPIN
8. TEN SPIN
9. ATV SPRING RIDER
10. MINI CITY TRUCK
11. MM ODYSSEY HALL
12. MAGICAL MUSIC INSERT
13. SWG PART INCLUSIVE SEAT W/CHAIN FOR 8′
14. 360 DEG TOT SEAT 8’
Proposed Price: $ 87,820.00
4.167% Tax: 3,659.46
Bonding 2,744.38
Total Contract: $ 94,223.84